Notes de cours (PDF) sur Moodle

Vidéos d’apprentissage du logiciel MS-Project (6 capsules)

 

 

* Tout autre matériel supplémentaire pourrait être ajouté en cours de session



Ouvrages de références

CTN200 :  Planification et contrôle des projets de construction, rév. H18, prof. Adel Francis.

CTN-416 : Planification et contrôle des projets de construction, rév. H00, prof. Jean Paradis.

GCI-416 : Planification et contrôle des projets de construction, rév. E03, prof. Pierre Gilbert, Edmond Miresco, Denis Martineau.

 

Antill, J., Woodhead, R. (1990). Critical Path Methods in Construction Pratice. New York: John Wiley & Sons, inc.

Badiru, A. B., Pulat P.S. (1995). Comprehensive Project Management : Integrating Optimization Models, Management Principles, and Computers. New Jersey: Prentice hall PTR.

Fisk, R. E. (2003). Construction Project Administration (7e éd.). New Jersey : Prentice hall.

Hinze, J.W. (2004). Construction Planning and Schedulling (2e éd.). Upper Saddle River, New Jersey : Prentice Hall.

Paradis, J., (2005). Gestion de projets de Construction à l'aide du logiciel Microsoft Project 1.0, PUQ Média, (DVD)

Peurifoy, R. L., Leroy, R., Schexnayder C., J, Boston, A. S., (2006). Construction planning, equipment, and methods (7e éd.). Boston, McGraw-Hill Inc.

Ardila, F., Francis, A.  2020. Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art. Frontiers in Built Environment, 6(128): 1-13.

Francis, A.  2020. Chronographical Site-Spatial-Temporal Modeling of Construction Operations. Frontiers in Built Environment, 6(67): 1-9.

Francis, A., Miresco E., Le Meur, E. 2019. Spatiotemporal chronographical modeling of procurement and material flow for building projects. Advances in Computational Design, 4(2): 119-139.

Francis, A. 2019. Chronographical Spatiotemporal Scheduling Optimization for Building Projects. Frontiers in Building Environment, 5(36): 1-14.

Francis, A., Morin-Pepin, S. 2017. The concept of float calculation based on the site occupation using the chronographical logic. Procedia Engineering, 196: 690-697.

Francis, A. 2017. Chronographic Allocation Techniques for Construction Projects. Journal of Civil Engineering and Science (JCES), 6(1): 24-36.

Francis, A. 2016. A chronographic protocol for modelling construction projects. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 169(4): 168-177.

Francis, A. 2016. Comparing Time and Quality Scales for Relatinship and Float Calculations. Procedia Engineering, 164: 49-56.

Francis, A. 2015. Graphical modelling classification for construction project scheduling. Procedia Engineering, 123: 162-168.

Francis, A., Ardila, F. 2015. The Chronographic Protocol: Validation of textures and colors. International Journal of Innovative Technology and Exploring Engineering (IJITEE), 5(7): 36-43.

Francis, A. 2013. The Chronographical Approach for construction project modelling. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 166(4): 188-204.

Guide des manutentions et des approvisionnements dans le bâtiment. Approuvé et adopté par le Comité Technique Régional du Bâtiment et des Travaux Publics de la Caisse Régionale d’Assurance Maladie d’Ile-de-France, 2005

Méthode d’analyse des manutentions dans les activités de chantier et du BTP,  Institut national de recherche et de sécurité (INRS) (2003)

Parent, L., Lean construction PPT


Adresse internet du site de cours et autres liens utiles

Le cours est sur le site Moodle de l'école