CTN200 : Planification et contrôle des projets de construction, rév. H18, prof. Adel Francis.
CTN-416 : Planification et contrôle des projets de construction, rév. H00, prof. Jean Paradis.
GCI-416 : Planification et contrôle des projets de construction, rév. E03, prof. Pierre Gilbert, Edmond Miresco, Denis Martineau.
Antill, J., Woodhead, R. (1990). Critical Path Methods in Construction Pratice. New York: John Wiley & Sons, inc.
Badiru, A. B., Pulat P.S. (1995). Comprehensive Project Management : Integrating Optimization Models, Management Principles, and Computers. New Jersey: Prentice hall PTR.
Fisk, R. E. (2003). Construction Project Administration (7e éd.). New Jersey : Prentice hall.
Hinze, J.W. (2004). Construction Planning and Schedulling (2e éd.). Upper Saddle River, New Jersey : Prentice Hall.
Paradis, J., (2005). Gestion de projets de Construction à l'aide du logiciel Microsoft Project 1.0, PUQ Média, (DVD)
Peurifoy, R. L., Leroy, R., Schexnayder C., J, Boston, A. S., (2006). Construction planning, equipment, and methods (7e éd.). Boston, McGraw-Hill Inc.
Ardila, F., Francis, A. 2020. Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art. Frontiers in Built Environment, 6(128): 1-13.
Francis, A. 2020. Chronographical Site-Spatial-Temporal Modeling of Construction Operations. Frontiers in Built Environment, 6(67): 1-9.
Francis, A., Miresco E., Le Meur, E. 2019. Spatiotemporal chronographical modeling of procurement and material flow for building projects. Advances in Computational Design, 4(2): 119-139.
Francis, A. 2019. Chronographical Spatiotemporal Scheduling Optimization for Building Projects. Frontiers in Building Environment, 5(36): 1-14.
Francis, A., Morin-Pepin, S. 2017. The concept of float calculation based on the site occupation using the chronographical logic. Procedia Engineering, 196: 690-697.
Francis, A. 2017. Chronographic Allocation Techniques for Construction Projects. Journal of Civil Engineering and Science (JCES), 6(1): 24-36.
Francis, A. 2016. A chronographic protocol for modelling construction projects. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 169(4): 168-177.
Francis, A. 2016. Comparing Time and Quality Scales for Relatinship and Float Calculations. Procedia Engineering, 164: 49-56.
Francis, A. 2015. Graphical modelling classification for construction project scheduling. Procedia Engineering, 123: 162-168.
Francis, A., Ardila, F. 2015. The Chronographic Protocol: Validation of textures and colors. International Journal of Innovative Technology and Exploring Engineering (IJITEE), 5(7): 36-43.
Francis, A. 2013. The Chronographical Approach for construction project modelling. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 166(4): 188-204.
Guide des manutentions et des approvisionnements dans le bâtiment. Approuvé et adopté par le Comité Technique Régional du Bâtiment et des Travaux Publics de la Caisse Régionale d’Assurance Maladie d’Ile-de-France, 2005
Méthode d’analyse des manutentions dans les activités de chantier et du BTP, Institut national de recherche et de sécurité (INRS) (2003)
Parent, L., Lean construction PPT