Logo ÉTS
Session
Cours
Responsable(s)

Se connecter
 

Sauvegarde réussie
Echec de sauvegarde
Avertissement






Documentation obligatoire

Les documents obligatoires seront disponibles sur Moodle.



Ouvrages de références

AKUNYUMU, S., FUGAR, F.D.K., ADINYIRA, E.; DANKU, J.C. (2020) A review of models for assessing readiness of construction organizations to innovate. Construction Innovation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/CI-01-2020-0014

DUBOULOZ, S. (2013). Les barrières à l’innovation organisationnelle : Le cas du Lean Management. Management international / International Management / Gestiòn Internacional, 17 (4), 121–144. https://doi.org/10.7202/1020673ar

EMMITT, S. Architectural Management – an evolving field. Engineering, Construction and Architectural Management, v.6, n.2, p. 188-196 .December/2001.

FABRICIO, M. M.; MELHADO, S.B.  Concurrent Design: a model for integrated product development. In: Stephen Emmitt; Matthijs Prins; Ad den Otter. (Org.). Architectural Management: international research & practice. 1ed.Oxford: Wiley-Blackwell, 2008

HENRY, E.; MELHADO, S.  The difficulties of public construction procurement in France and main innovative methods proposed for contractor selection.  CIB W92 Construction Procurement System Symposium: proceedings.   Santiago, Chile 24-27 April, 2000.  p.785-800.

KOSKELA, L.; HUOVILA, P.; LEINONEN, J. Design management in building construction: from theory to practice. Journal of Construction Research, v.3, n.1, p.1-16, 2002.

LIU, Ana Wansul; MELHADO, S.B.  Office building design conception guidelines. In: CIB 2010 World Congress, 2010, Salford. Building a Better World - Full Paper Proceedings. Salford: University of Salford, 2010.

LE ROY, F.; ROBERT, M.; GIULIANI, P. (2013)  L'innovation managériale: Généalogie, défis et perspectives. Revue française de gestion, 235(6), 77-90. URL: https://www.cairn.info/revue-francaise-de-gestion-2013-6-page-77.htm

MANZIONE, L., MELHADO, S.B. Why is design delivery always behind schadule? A critical review of the design planning techniques adopted for Real Estate projects in São Paulo - Brazil. Proceedings of the CIB World Building Congress 2007, Cape Town, South Africa, 2007. pp 850-862.

MANZIONE, L.; ABAURRE, Mariana Wyse; OWEN, Robert; MELHADO, S.B.. Challenges for Implementation of a New Model of Collaborative Design Management: Analyzing the Impact of Human Factor. In: Architectural Management in the Digital Arena. Proceedings of CIB-W096 2011. Eindhoven: University Press, Eindhoven University of Technology (TU/e), 2011. p. 256-266.

MELHADO, S.; HENRY, E.  Quality management in French architectural offices and its singularities.  In: International Conference on Implementation of Construction Quality and Related Systems: a Global Update.  Lisbon, 2000.  Proceedings.   Lisbon, CIB Task Group TG36, 2000.  p.371-384.

MELHADO, S.B.; FABRICIO, M.M.; EMMITT, S.; BOUCHLAGHEM, D. The building design process in the context of different countries. In: Architectural Management in the Digital Arena, 2011, Viena. Proceedings of CIB-W096 2011 Vienna. Eindhoven: University Press, Eindhoven University of Technology (TU/e), 2011. p. 241-255.

MELHADO, S.B. ; SOUZA, A. L. R.  Qualité et gestion des projets privés d'habitat au Brésil. In: Véronique Biau; François Lautier. (Org.). Cahiers RAMAU n. 5 - La qualité architecturale - Acteurs et enjeux. 1ed.Paris: Éditions de La Villette, 2009, p. 183-195.


Adresse internet du site de cours et autres liens utiles

https://www.etsmtl.ca/etudes/cours/MGC821