AKUNYUMU, S., FUGAR, F.D.K., ADINYIRA, E.; DANKU, J.C. (2020) A review of models for assessing readiness of construction organizations to innovate. Construction Innovation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/CI-01-2020-0014
DUBOULOZ, S. (2013). Les barrières à l’innovation organisationnelle : Le cas du Lean Management. Management international / International Management / Gestiòn Internacional, 17 (4), 121–144. https://doi.org/10.7202/1020673ar
EMMITT, S. Architectural Management – an evolving field. Engineering, Construction and Architectural Management, v.6, n.2, p. 188-196 .December/2001.
FABRICIO, M. M.; MELHADO, S.B. Concurrent Design: a model for integrated product development. In: Stephen Emmitt; Matthijs Prins; Ad den Otter. (Org.). Architectural Management: international research & practice. 1ed.Oxford: Wiley-Blackwell, 2008
HENRY, E.; MELHADO, S. The difficulties of public construction procurement in France and main innovative methods proposed for contractor selection. CIB W92 Construction Procurement System Symposium: proceedings. Santiago, Chile 24-27 April, 2000. p.785-800.
KOSKELA, L.; HUOVILA, P.; LEINONEN, J. Design management in building construction: from theory to practice. Journal of Construction Research, v.3, n.1, p.1-16, 2002.
LIU, Ana Wansul; MELHADO, S.B. Office building design conception guidelines. In: CIB 2010 World Congress, 2010, Salford. Building a Better World - Full Paper Proceedings. Salford: University of Salford, 2010.
LE ROY, F.; ROBERT, M.; GIULIANI, P. (2013) L'innovation managériale: Généalogie, défis et perspectives. Revue française de gestion, 235(6), 77-90. URL: https://www.cairn.info/revue-francaise-de-gestion-2013-6-page-77.htm
MANZIONE, L., MELHADO, S.B. Why is design delivery always behind schadule? A critical review of the design planning techniques adopted for Real Estate projects in São Paulo - Brazil. Proceedings of the CIB World Building Congress 2007, Cape Town, South Africa, 2007. pp 850-862.
MANZIONE, L.; ABAURRE, Mariana Wyse; OWEN, Robert; MELHADO, S.B.. Challenges for Implementation of a New Model of Collaborative Design Management: Analyzing the Impact of Human Factor. In: Architectural Management in the Digital Arena. Proceedings of CIB-W096 2011. Eindhoven: University Press, Eindhoven University of Technology (TU/e), 2011. p. 256-266.
MELHADO, S.; HENRY, E. Quality management in French architectural offices and its singularities. In: International Conference on Implementation of Construction Quality and Related Systems: a Global Update. Lisbon, 2000. Proceedings. Lisbon, CIB Task Group TG36, 2000. p.371-384.
MELHADO, S.B.; FABRICIO, M.M.; EMMITT, S.; BOUCHLAGHEM, D. The building design process in the context of different countries. In: Architectural Management in the Digital Arena, 2011, Viena. Proceedings of CIB-W096 2011 Vienna. Eindhoven: University Press, Eindhoven University of Technology (TU/e), 2011. p. 241-255.
MELHADO, S.B. ; SOUZA, A. L. R. Qualité et gestion des projets privés d'habitat au Brésil. In: Véronique Biau; François Lautier. (Org.). Cahiers RAMAU n. 5 - La qualité architecturale - Acteurs et enjeux. 1ed.Paris: Éditions de La Villette, 2009, p. 183-195.